25 December 2022
Lemmi prepares the hollow shafts for the long AWI drill which has a 4 m long core barrel
Lemmi prepares the hollow shafts for the long AWI drill which has a 4 m long core barrel

Read the field diary from 25. December 2022 here.

You can follow the progress of the drilling operation in this graph.