5 January 2022
View along the drill tower through the BEOIC drill tent with the open roof, the driller’s cabin and the fluid recycling cabin along the right side of the tent
View along the drill tower through the BEOIC drill tent with the open roof, the driller’s cabin and the fluid recycling cabin along the right side of the tent

Read the field diary from 5. January 2022 here.